The house on Arsenalnaya Embankment
About the project:
The house on Arsenalnaya Embankment is a special project of Pioneer Group.
The architectural design of the House includes using the most modern materials and technologies, but at the same time its look is styled to resemble the Empire style of the 30’s – 50’s of the 20th century, that is why the house on Arsenalnaya Embankment is an ideal solution for those who want to purchase modern business-class housing.
The design of the house was created by the Finish architectural bureau. Empire style architecture is represented by buildings of the Stalin era, its distinctive features are: monumentality, high ceilings, impressive façade. Natural materials were used in constructing the house: brick, marble, granite, wood.
The new business-class apartment block is built in the historic part of St.-Petersburg, within a 3-minute walk from the quay of the Neva-river and metro station “Ploshad Lenina”. The house is situated in the yard of a block, which borders are made up by Arsenalnaya embankment, Komsomola street, Lenin square and Mihailova street.
The unit represents an 8-storied building with an attic floor with a view on the historic centre of the city. The house has a two level heated underground car park of 66 parking slots. On the first floor there is a modern kindergarten for 80 children, with a children’s playground.
Pioneer Group offers a wide choice of elite free-layout apartments from 45,3 to 159,4 sq.m. All the apartments of the complex have 3,1 meter ceilings, double glazing, glassed-in balconies and recessed balconies. Our own service organization takes charge of all the operation and maintenance works.
To put it short, the house on Arsenalnaya Embankment is an ideal living space for people who enjoy comfort and modern megapolis dynamics. Flexible payment dates, an advantageous mortgage credit from Sberbank, Bank “St.-Petersburg” or Gasprom and quick processing of documents make buying a flat in the house on Arsenalnaya Embankment an easy and enjoyable event.
End of construction - 4th quarter of 2009. The house is commissioned.
| 








